Aangan by Aastha
Status
Completed
Project Type
Residential
Project Area
1100 yds
Years
2003 - 2004
Project description
Aangan by Aastha is a thoughtfully designed residential project developed in 2003–2004, offering spacious 3 BHK homes on an expansive 1100 sq. yds. plot. Located on the prime New 150 Feet Ring Road in Rajkot, the project ensures excellent connectivity and a comfortable urban lifestyle.
Crafted with a focus on modern living and practical design, Aangan provides well-planned homes that balance space, ventilation, and natural light. The project reflects quality construction and a peaceful residential environment, making it ideal for families seeking both convenience and comfort.
With its completed status, Aangan stands as a ready and established community, offering immediate occupancy and a well-settled neighborhood. Its strategic location, combined with functional design, makes it a reliable and valuable residential choice in Rajkot.
Key Details
- Location: New 150 feet ring road, Rajkot
- Total Built-Up Area:1100 yds
- Project Specification: 3 BHK
- Years: 2003 - 2004
- Project Type: Residential
Features & amenities
24x7 Security
Round-the-clock surveillance and trained personnel ensure a safe and secure environment at all times.
Power Backup
Reliable backup systems to ensure uninterrupted electricity during outages
Elevators/Lifts
Modern and efficient lift systems for smooth and quick access across all floors
Parking Facilities
Spacious and well-organized parking areas designed for convenience and easy vehicle access
Maintenance Services
Dedicated support for regular upkeep, repairs, and cleanliness of the property
Water Supply
Continuous and well-managed water supply to meet daily needs without interruption
Fire Safety Systems
Advanced fire protection measures including alarms and extinguishers for emergency readiness
Internet Connectivity
High-speed internet infrastructure to support work, communication, and entertainment
Location
Location
address
2972 Westheimer Rd. Santa Ana, Illinois 85486
Key transport
Coast
300m
University
750m
Supermarket
500m
Park
1120m
Railway station
1750m
Airport
3158m
Bus station
450m
Bank
415m
Hospital
350m
